Front deck, steps and hand rail

The front deck, steps and hand rail had become weather beaten, warped and rusted out. I replaced it with #2 Red Cedar 2”x10” planks, 4”x4” posts and put on a coat of water seal. It is still looking good after a few winters and lots of direct sun.

Original deck before demolition


Demolition time


Rebuild in #2 Red Cedar


Water sealing and installing slats

Previous
Previous

Motorcycle Ramp

Next
Next

Odd Stuff